01
MF51 Series Radial Glass Sealed Bead Long Lead Chip in Glass NTC Thermistor
Feature
01
Glass-sealed bead provides High-level heat resistance and high environmental Stability
02
Proven long term Reliability with low power requirement
03
Smaller size, High Sensitivity and Faster thermal response than conventional thermistors
Product Specifications
Resistance R25 |
B-value (25/85℃) |
Accuracy |
Rated Power |
Dissi.Coef. |
Thermal time |
Operating |
1 |
3305 |
0.1%-5% |
≤50 |
≥1.0 |
≤12 |
-40~+260℃ |
2 |
3540 |
|||||
5 |
3435 |
|||||
10 |
3435 |
|||||
10 |
3977 |
|||||
20 |
3960 |
|||||
50 |
3960 |
|||||
100 |
3960 |
|||||
200 |
4263 |
We can supply various customized NTC Thermistor according to your unique request.
Product Dimension
Installation method
When welding, from body root to 3mm. Soldering Temp. should be below 265 ℃. Soldering time should be as short as possible.
Application
Widely used in temperature measurement, detection, indication, monitoring, measurement, control, calibration, and compensation.
■ HVAC equipment, water heaters, microwave ovens, home appliances.
■ Assembly into various probes of Temperature sensors.
■ General Instrumentation applications.
Why choose us?
1. Rigorous Quality Control (QC) Systems
2. After-Sales Guarantee
FAQ








Send Inquiry









