Leave Your Message
MF51 Series NTC Thermistor - High Precision Glass Sealed Bead Long Lead from China Suppliers & Factory
Hot Products

MF51 Series NTC Thermistor - High Precision Glass Sealed Bead Long Lead from China Suppliers & Factory

,

Product Description

,

Introducing the MF51 series, a high-precision NTC thermistor designed for accurate temperature measurement and protection. Manufactured in China, this thermistor offers exceptional stability and reliability, making it an ideal choice for various applications.

,

Functionality

,

With its advanced technology, the MF51 series serves as a vital component for temperature measurement and protection systems. Sourced directly from trusted suppliers and produced in a state-of-the-art factory, it guarantees top-tier performance for all your temperature solutions.

,

    Features

    01
    Glass-sealed bead provides High-level heat resistance and high environmental Stability
    02
    Proven long term Reliability with low power requirement
    03
    Smaller size, High Sensitivity and Faster thermal response than conventional thermistors

    Product Specifications

    Resistance R25
    (KΩ)

    B-value (25/85℃)
    (K)

    Accuracy

    Rated Power
    (mw)

    Dissi.Coef.
    (mw/C)

    Thermal time
    Constant(S)

    Operating
    Temp.(C)

    1

    3305

    0.1%-5%

    ≤50

    ≥1.0
    In Still Air

    ≤12
    In Still Air

    -40~+260℃

    2

    3540

    5

    3435

    10

    3435

    10

    3977

    20

    3960

    50

    3960

    100

    3960

    200

    4263

    We can supply various customized NTC Thermistor according to your unique request.

    Product Dimension

    Product Dimension Drawing

    Installation Method

    🔧
    When welding, from body root to 3mm. Soldering Temp. should be below 265 ℃. Soldering time should be as short as possible.

    Application

    🌡️

    Widely used in temperature measurement, detection, indication, monitoring, measurement, control, calibration, and compensation.

    ⚙️

    ■ HVAC equipment, water heaters, microwave ovens, home appliances.

    ■ Assembly into various probes of Temperature sensors.

    ■ General Instrumentation applications.

    Why Choose Us?

    1. Rigorous Quality Control (QC) Systems
    With procedures to trace raw material.
    With clear written instructions and records.
    100% of products with detailed inspection.
    2. After-Sales Guarantee
    Yes.
    Yes, with a standard feedback form and records.
    Yes, with clear procedures and written records.
    Yes.
    Yes, main raw material can be traced.
    Yes.
    1-year warranty.

    FAQ

    Yes, we could provide free samples to test and check quality. Freight cost is collected.
    Sample needs about 7~10 working days to prepare; mass production average time takes 15–20 working days.
    Yes, but it depends on the product. Normally MOQ is 1K~10K pcs.
    We do FOB SHANGHAI if order amount is more than 5000 USD. Less than that, it is EXW and we do not undertake local charges.
    Basically for NTC Thermistor, it requires detailed Resistance and B-value. If you have more information, such as type, dimension, or product photo for reference, you are welcome to provide those as well.
    Yes, we can supply various customized NTC Thermistors according to your unique request. Please contact us with your specific technical requirements and we will provide a tailored solution.

    Send Inquiry