China MF51 Series NTC Thermistor - High-Precision Radial Glass Sealed Bead Long Lead Chip from Reliable Suppliers and Factory
Features
01
Glass-sealed bead provides high-level heat resistance and high environmental stability.
02
Proven long-term reliability with low power requirement.
03
Smaller size, high sensitivity and faster thermal response than conventional thermistors.
Product Specifications
Resistance R25 |
B-value (25/85℃) |
Accuracy |
Rated Power |
Dissi.Coef. |
Thermal Time |
Operating |
| 1 | 3305 | 0.1%–5% | ≤50 | ≥1.0 In Still Air |
≤12 In Still Air |
-40~+260℃ |
| 2 | 3540 | |||||
| 5 | 3435 | |||||
| 10 | 3435 | |||||
| 10 | 3977 | |||||
| 20 | 3960 | |||||
| 50 | 3960 | |||||
| 100 | 3960 | |||||
| 200 | 4263 |
✦We can supply various customized NTC Thermistors according to your unique request.
Product Dimension
Installation Method
🔧
When welding, from body root to 3mm. Soldering temperature should be below 265 °C. Soldering time should be as short as possible.
Application
🌡️
Widely used in temperature measurement, detection, indication, monitoring, measurement, control, calibration, and compensation.
⚙️
■ HVAC equipment, water heaters, microwave ovens, home appliances.
■ Assembly into various probes of temperature sensors.
■ General instrumentation applications.
Why Choose Us?
1. Rigorous Quality Control (QC) Systems
2. After-Sales Guarantee
FAQ
Send Inquiry









